All projectsMaterial handling equipment · Project 04

Lifting grab

Lifting grab developed for safe load gripping and handling, from mechanical substantiation through to final integration.

DisciplineHandling · Gripping & lifting
Documented scope5 project stages
Lifting grab — FORGIA industrial project
01 — Project journey

From requirement to industrial reality.

A documented view of the decisive engineering, manufacturing and validation steps.

  1. 01Engineering & 3D CAD
  2. 02FEA calculations & validation
  3. 032D drawings & bill of materials
  4. 04Manufacturing & load testing
  5. 05Final integration
Stage 01

Engineering & 3D CAD

Mechanism design and definition in CATIA R27

Stage 02

FEA calculations & validation

Mesh, displacements and numerical validation under load

Stage 03

2D drawings & bill of materials

Assembly drawing, sections, component identification and definition package

Stage 04

Manufacturing & load testing

Mechanism manufacturing and validation under representative load

Stage 05

Final integration

Final assembly, functional inspection and preparation for commissioning

Have a similar challenge?

Let’s study your
industrial project.

Request a quote